“The 300′ roll of Python worked out extremely well as we were able to avoid having to braze couplings in inconvenient places.”
– RT Moore
Project Details:
- Completion: 2024
- Location: Greenwood, IN
- Project Type: Residential
- Size: –
- Application: Split System
- Contractor: RT Moore
- Supplier: Central Supply
- Supplier Rep: TOP Marketing, Inc.
The Challenges:
- The builder buried a 2″ piece of conduit under concrete, which made it extremely difficult to pull the lineset through.
- The heat pump was placed on the backside of a different building, making for a very long run.
The Solutions:
- The 300′ roll of pipe worked out extremely well as we avoided having to braze couplings in inconvenienct places.
The Benefits:
- The line set length was 155′, so we were very happy with Python’s flexibility and coming in a large 300′ roll with ft. markings printed directly on the pipe.