Project Details:
  • Completion: 2024
  • Location: Greenfield, IA
  • Project Type: Residential
  • Size:
  • Application: Mini-Split
  • Contractor: APS (Advanced Problem Solutions)
  • Supplier: McDonald Supply
The Challenges:
  • Multiple runs feeding the multi-zone mini-split system.
  • Long lines needed.
The Solutions:
  • Python pipe came in a long 300′ coil.
  • Ft. markings on the pipe ensured we had proper lengths without making multiple measurements or cuts.
The Benefits:
  • Long coil lengths reduced our need to make multiple connections.
  • The pipe was strong enough that we didn’t have to worry about kinking, but still flexible enough to make it really easy to bend and work with.
  • The fittings went on smooth and easy. Very straightforward.